White Paper Synopsis

This paper presents the concept of an ultracapacitor module with an operating voltage of 48V for bridge power in UPS systems. The device is able to operate for more than 15 years at 125 F, requiring limited maintenance and reducing the costs of currently utilized lead acid batteries. The yearly cost savings for a medium scale data center using FastCAP ultracapacitors instead of lead acid batteries is projected to be $500k. The yearly energy savings in the U.S. for running data centers at 125 F is projected to be 31.5 TWh, while the energy savings related to energy storage cooling elimination is projected to be 130 GWh.

By filling out the template to the right, you will receive an email to download the white paper.

High Temperature Ultracapacitors for Rack Level Data Center UPS'